GUD Electric LLC Logo
ev_station Level 2 Home Charging

Ready for a Home EV Charger in the Poconos?
Wake Up Fully Charged.

A properly installed Level 2 home charger adds up to 25 miles of range per hour — so your EV is always full when you need it. We handle the whole job, start to finish.

Serving Stroudsburg, the Poconos & NEPA — licensed and insured.

verified Licensed & Insured ev_station All EV Makes & Models handyman Clean, Professional Work

Level 1 vs. Level 2 Charging — The Real Difference

Most EVs come with a Level 1 cord you can plug into a standard outlet. It works — but for daily driving in NEPA, it's rarely enough. Here's why a Level 2 install changes everything.

outlet

Level 1 — Standard 120V Outlet

  • cancel Adds only 3–5 miles of range per hour — barely covers local errands overnight
  • cancel A depleted 50 kWh battery can take 40–60 hours to fully recharge
  • cancel Using a standard outlet long-term can overheat the circuit — not designed for continuous 8-hour draws
  • cancel No smart scheduling — charges at whatever rate the outlet allows
Recommended
ev_station

Level 2 — Dedicated 240V Circuit

  • check_circle Adds 15–30 miles of range per hour — a full charge while you sleep
  • check_circle Most EVs go from empty to full in 4–8 hours on Level 2
  • check_circle Dedicated 50A circuit — built for continuous high-draw charging, safely
  • check_circle Smart chargers can schedule off-peak charging to save money on electric rates

Range Added per Hour of Charging

Level 1 (120V standard outlet) ~4 miles/hr
4 mi/hr
Level 2 (240V dedicated circuit) ~25 miles/hr
~6× faster than Level 1

Plug in at night. Full charge by morning.

Charging speeds vary by EV make, model, and onboard charger capacity. Estimates based on a 48A Level 2 EVSE with a 40A continuous draw.

Why Get a Dedicated Home Charger

A professionally installed Level 2 charger isn't a luxury — it's what makes owning an EV in NEPA actually practical.

speed

6× Faster Than a Wall Outlet

Level 2 charging adds 15–30 miles of range per hour versus the 3–5 miles a standard 120V outlet provides. For most NEPA drivers, overnight Level 2 charging means you never need a public fast charger.

savings

Charge on Off-Peak Rates

Smart Level 2 chargers let you schedule charging for overnight off-peak hours when electricity rates are lowest. Pair with PPL's time-of-use rates and cut your charging cost significantly.

trending_up

Adds Home Value

A hardwired Level 2 charger in the garage is a growing selling point as EV ownership climbs. Buyers with EVs — or planning to get one — will pay a premium for a home that's already ready.

shield

Safer Than a Shared Circuit

Plugging a Level 1 cord into a shared garage circuit for 8+ hours strains wiring not designed for that load. A dedicated 50A circuit is built specifically for continuous EV charging — no fire risk, no nuisance trips.

garage

Works in Any Garage Setup

Whether your panel is in the garage, basement, or utility room — we run the circuit cleanly, route conduit properly, and mount the charger where it's most useful for your vehicle's charge port location.

redeem

Federal Tax Credit Available

The federal Alternative Fuel Vehicle Refueling Property Credit (30C) offers up to 30% back (max $1,000) on the cost of your home EV charger installation. We provide documentation to support your claim.

The Full Install

A Clean, Code-Compliant Charger Install — Not a Workaround

We don't install a dryer outlet and call it done. A proper EV charger installation means a dedicated 50A circuit from your panel, correctly sized wiring, a weatherproof outlet or hardwired EVSE, and a permit on file — ready for any charger you choose.

We work with all major charger brands — ChargePoint, Enel X JuiceBox, Tesla Wall Connector, Emporia, and more — and can advise on the best fit for your home and vehicle.

50A

Dedicated circuit standard

240V

Level 2 service

All EVs

Tesla, Ford, GM, Rivian & more

Permit

Pulled & inspected every install

What's Included in Every EV Charger Install

  • check_circle

    Panel Assessment

    We check your current panel capacity and confirm it can handle the new 50A circuit — and advise on an upgrade if it can't.

  • check_circle

    Dedicated 50A Circuit

    Properly sized wire run from your panel to the charging location — in conduit, protected, and done cleanly.

  • check_circle

    EVSE or NEMA 14-50 Outlet

    Hardwired charger or a NEMA 14-50 outlet — your choice based on whether you want a fixed unit or flexibility to swap chargers.

  • check_circle

    Permit & Inspection

    We pull the permit and schedule the inspection — everything documented and on file.

Ready to Charge at Home?

Stop relying on public chargers or a slow wall outlet. A Level 2 home charger is the single best upgrade you can make as an EV owner — and we'll have it installed and inspected in a day.

Serving Monroe County, the Pocono Mountains, Stroudsburg, East Stroudsburg & surrounding NEPA areas.

EV Charger Questions

Common questions before every home charger installation.